Comprehensive Program of Institutional Strengthening (PIFI) 2010-2011
- Institutional
- ProGES
- ProDES 1396 Campus Celaya-Salvatierra
- ProDES 1397 Campus Guanajuato
- ProDES 1399 Campus Irapuato-Salamanca
- ProDES 1400 Campus León
- Annexes
- Final result from the PIFI evaluation 2010-2011
- Annex “A” of PIFI Reprogramming 2011
- Final result from the Comprehensive PIFI evaluation 2012-2013
- PIFI reprogramming annex 2012
Comprehensive Program of Institutional Strengthening (PIFI) 2008-2009
- Institutional
- Pro GES
- DES Arts
- DES Economic-Administrative
- DES Engineering
- DES Naturals
- DES Health
- DES Social
- PIFI execution annex 2009
- PFI execution annex 2010
Comprehensive Program of Institutional Strengthening (PIFI) 2007




